Construction

Construction2024-05-14T15:31:38+08:00
Excavator at Construction Site

our approach aimed at maximizing productivity & efficiency.

Shane C. Peterson

Founder, Avada Factory Inc.

modern ways of manufacturing products.

Aenean et tellus facilisis luctus magna et, ullamcorper velit. Suspendisse potenti. Nam non erat magna. Nunc ac fringilla neque. Suspendisse fermentum purus id ipsum aliquam, nec feugiat metus molestie. Fusce finibus sem volutpat hendrerit dolor eget.

En pellentesque magna nec libero suscipit aliquam. Vestibulum ante ipsum primis faucibus orci luctus et ultrices posuere cubilia curae; Fusce dui est, ultricies nec ultriciesa porttitor quis tellus. Sed tristique erat, ac rhoncus nisl. Mauris erat urna, egestas nec nibh ut, sagittis convallis lacun. Phasellus varius urna in scelerisque convallis. Aenean rhoncus non eros et viverra.

Industry 4.0 – the systematic approach

Nam gravida erat vel metus varius, imperdiet facilisis lorem pharetra. Vestibulum convalis porter duiy in congue felis eleifend eget. Aliquam nulla eros, ultrices sit amet tempus ac, elementum at ipsum. Donec sollicitudin commodo tellus at rutrum.

  • Pulvinar vestib alum purus pulvinar tincidunt
  • Eget congue sollicitudin mattis a lobortis

  • Convallis diam morbi dis at arcu sed morbi dolor
predictive machines

Fusce dui est ultricies nec ultricies acd porttitor quis tellus ned.

certified factory

Fusce dui est ultricies nec ultricies acd porttitor quis tellus ned.

integration of digital technologies into manufacturing processes – creating smart factories.

service related FAQ’s

Which standard do your vavle producing follow? Do you have any certification ?2022-03-14T16:43:35+08:00

Our design and production of valve is following ISO 4126 and CE PED order. All our product is certificated with CE certification. Able to be sold in EU region.

Do you have any spot goods valve? How long is the leadtime ?2022-03-14T16:43:55+08:00

The regular valve has parts in stock waiting for assembling and adjustment for different customer’s equipments setting pressure. We test and adjust all the valve before shipping. It will take around 3 days. Some of the special valve is customer made order excepted. If you have bulk order or urgent need, please contact us for further assistance.

What is the difference between the seal type and lever type of the valve?2022-03-17T13:38:18+08:00

It depends on if you can accept the fluid to leak. Generally speaking, The seal type is seal designed on the top to prevent the leakage. It can be used with the higher temperature or corrosive, noble fluid. The lever type have the manual discharge testing function so it’s not 100% sealed. It can be use with water, and other fluid that’s safe to be leaked. Also, due to the complexity of the structure. The price of the lever type is higher than the seal type.

What is the role of IoT in factories?2024-05-07T19:51:30+08:00

IoT connects devices and equipment in factories to collect and exchange data, enabling real-time monitoring, remote control, and predictive maintenance.

How is the paymnet process?2022-03-14T16:43:51+08:00

The customer who is ordering with us in the first time will need to remit the full payment before shipping. If there’s any special requirement please don’t hesitates to let us know.

Go to Top